Dáil debates

Thursday, 24 March 2005

3:00 pm

Photo of Damien EnglishDamien English (Meath, Fine Gael)

He would be embarrassed if he were present today to hear that reply. Iarnród Éireann has stated that it is happy to build the line. However, two things are required. It is seeking a commitment of funding. Can the Department ring-fence funding to deliver this rail link? I accept that it is affected by what happens in Dublin but the Navan to Dunboyne link should be built at the same time the work is being done in Dublin rather that one waiting until the other is completed, which is crazy. That is a decision for the Minister through the allocation of funding.

Second, the Minister was most encouraging a month ago with regard to providing the money to complete the second part of the feasibility study on building a link from Dunboyne to Navan. He agreed with me that it would be sensible to have it ready. We should consider doing it.

When I asked the Taoiseach about this matter he said he saw merit in the rail link being built parallel with the M3 motorway. He also agreed that it had not been considered. I am sure it was not considered because nobody can confirm that it was. Will the Minister examine this? Is it possible to construct the rail link in line with the motorway given that land is being compulsorily purchased for the road? Other countries do it so why not this country? It is a shame it has not been considered. It would save a great deal of money for the Exchequer.

Comments

No comments

Log in or join to post a public comment.