Mr. Barry Kelly:

The maximum cap is €2.6 billion, which includes contingencies of €500 million. Assuming we do not use those contingencies, the figure will be €2.1 billion. The numbers we have shared here today exclude any variations from our estimate. It is 92% of the total. The €1.1 billion cost of build, approximately €900 million cost of rentals over 25 years and approximately €700 million for connections capital expenditure means a total of €2.7 million.