Oireachtas Joint and Select Committees

Tuesday, 5 November 2019

Joint Oireachtas Committee on Housing, Planning and Local Government

Issues Affecting the Quality of Water: Discussion

Dr. Michelle Minihan:

Unfortunately, I cannot be specific on timelines. The reason for that is that the size of the UV facility that will be required at Leixlip is significant. As it is a significant piece of infrastructure and investment, it will need time to be physically be put on site, installed and verified to enure it is operating. That is because the volume of water treatment at Leixlip is so significant.

Comments

No comments

Log in or join to post a public comment.