Mr. Tom Costello:
Yes, but the site had been identified and the design team was instructed to design a hospital. The square footage of the hospital we are now building is quite similar to what was available at the Mater Hospital; therefore, the scope of the project was always defined. It was a defined site. The lesson we have learned is, as Mr. Pollock said, that before we appoint a design team or engage in any expenditure on behalf of the State, we need to stress-test the decision making. If we were to roll back six or seven years, the answer to the question of whether making sure all of the stress-testing was done before proceeding was the right thing to do is probably "Yes". We are reinforcing it, but that was our first step.