Mr. Adrian Neilan:

It changed at every point in time, but even in the April figure we provided for approximately €200,000 or €300,000 to put a capping layer on top of the site. We did this on the basis that, if everything followed through, the fill would be available to us free of charge. It did not work out, but it was not a part of the legal contract. When construction activity stopped, other opportunities were created for us in terms of overall construction costs, but we needed to fund the fill from within the project.