Mr. Conor Dunne:

At the time of purchase, it was zoned for housing. The problem was that in Birr there was very little land available for the proposed head office. It would have been within the OPW's then range of €100 to €500 per acre. The site was zoned for residential and mixed use. There is planning permission on it, although not for a building but for an access road.