Written answers

Tuesday, 23 January 2024

Department of Foreign Affairs and Trade

Question Heading for question(s) 106

Photo of Alan KellyAlan Kelly (Tipperary, Labour)
Link to this: Individually | In context | Oireachtas source

106. To ask the Minister for Foreign Affairs and Trade the running costs of the Irish Embassy in Washington DC, Paris and London in the years of 2022 and 2023, in tabular form. [2485/24]

Photo of Micheál MartinMicheál Martin (Cork South Central, Fianna Fail)
Link to this: Individually | In context | Oireachtas source

The running costs for the Embassies of Ireland in London, Paris and Washington DC for 2022 and 2023 are provided in tabular form below.

Embassy 2022 2023
London €4.5m €5.5m
Paris €2.6m €2.7m
Washington DC €1.8m €2.4m

Comments

No comments

Log in or join to post a public comment.