Written answers

Thursday, 2 July 2026

Department of Justice and Equality

Prison Service

Photo of Erin McGreehanErin McGreehan (Louth, Fianna Fail)
Link to this: Individually | In context

364. To ask the Tánaiste and Minister for Justice and Equality if he will provide details on the total cost of phase one of the development at The Grove, Castlerea Prison, including all associated planning, construction, consultancy, and related project costs; the total projected cost of phase two of the Grove development, including all associated planning, construction, consultancy, and related project costs; and if he will make a statement on the matter. [50522/26]

Photo of Jim O'CallaghanJim O'Callaghan (Dublin Bay South, Fianna Fail)
Link to this: Individually | In context

I can advise the Deputy that Phase 1 of the development at The Grove, Castlerea Prison - including all associated planning, construction, consultancy - has not yet been fully finalised. It is therefore not possible to outline the total final cost at this juncture.

Phase 1 will provide a single terrace of 4 modular houses, each with six bedrooms, a total of 24 spaces, and a new support and ancillary services building and expand the footprint of the Grove.

Phase 2 will see the construction of 21 lower-security living units within The Grove area of Castlerea Prison creating an additional 126 prison spaces.

As the project is still in progress details of costs at this particular time are commercially sensitive.

Photo of Erin McGreehanErin McGreehan (Louth, Fianna Fail)
Link to this: Individually | In context

365. To ask the Tánaiste and Minister for Justice and Equality the total cost of the construction works and modular units provided at Castlerea Prison, Loughan House Open Centre, and Shelton Abbey Open Centre, with the costs broken down on a site-by-site basis and including all associated planning, construction, consultancy, and related project costs; the total cost of the construction and renovation works for the Governors House at Loughan House Open Centre including all associated planning, construction, consultancy, and related project costs; and if he will make a statement on the matter. [50523/26]

Photo of Jim O'CallaghanJim O'Callaghan (Dublin Bay South, Fianna Fail)
Link to this: Individually | In context

I am advised that the total number of single modular units constructed is 24 with 10 at Loughan House, 10 at Shelton Abbey, 4 at The Grove at Castlerea Prison.

The Castlerea project also included the provision of two three-bedroom semi detached houses, providing shared accommodation for 6 people, resulting in a total of 10 additional spaces at Castlerea Prison.

The final individual VAT exclusive total project costs per unit is as follows;

Loughan House: €430K.

Shelton Abbey: €510K.

Castlerea Prison The Grove: €382K.

Loughan House Open Centre ‘Governors House’ (known as Spruce Lodge) included the full refurbishment of a 3 bedroom house and other common areas such as sitting room/kitchen etc. including new finishes, fixtures and fittings throughout. It also included significant upgrades on the mechanical, electrical and data installations. The house also had external insulated render applied to it and new windows and doors fitted.

The final renovation cost was €392K (exVAT)

Photo of Erin McGreehanErin McGreehan (Louth, Fianna Fail)
Link to this: Individually | In context

366. To ask the Tánaiste and Minister for Justice and Equality the projected cost of demolishing the old Cork Prison site, including all associated preparatory, environmental, safety, consultancy, and site clearance works required to render the site safe and fully prepared prior to the commencement of the new construction works; and if he will make a statement on the matter. [50524/26]

Photo of Jim O'CallaghanJim O'Callaghan (Dublin Bay South, Fianna Fail)
Link to this: Individually | In context

It is anticipated that a tender for the works will issue in the last quarter of this year. There are a number of old buildings to be demolished with various building materials to be removed in a specific manner which makes this a complex, but necessary undertaking.

This intended approach will ensure efficiencies with the design and the practical operations of the expanded prison.

The final overall cost will be subject to a tender process where a competitive tender return price will be determined. As the tendering process is a commercially sensitive procedure it is not proposed to outline potential costs at this juncture. The project will be planned and progressed in line with the requirements of the Infrastructure Guidelines.

Photo of Erin McGreehanErin McGreehan (Louth, Fianna Fail)
Link to this: Individually | In context

367. To ask the Tánaiste and Minister for Justice and Equality the total cost incurred to date by the Irish Prison Service in respect of the Organisation Dashboard Project; the costs associated with consultancy services, including payments made to a company (details supplied) and any other external providers; the costs on software development and procurement, software licensing, project management, training and staff development, hardware and ICT infrastructure, maintenance and support contracts, any other associated expenditure; the projected lifetime cost of the project; if he will provide a detailed breakdown of expenditure incurred and committed under each heading; and if he will make a statement on the matter. [50525/26]

Photo of Erin McGreehanErin McGreehan (Louth, Fianna Fail)
Link to this: Individually | In context

368. To ask the Tánaiste and Minister for Justice and Equality the average daily number of users who logged on to the Irish Prison Service Organisational Dashboard during each of the first five months of 2026, by month; the estimated annual costs associated with maintaining the Irish Prison Service Organisational Dashboard for the period January 2026 to January 2030, including software licensing, maintenance and support, hosting, infrastructure, upgrades, training, and any other associated costs, by year; and if he will make a statement on the matter. [50526/26]

Photo of Jim O'CallaghanJim O'Callaghan (Dublin Bay South, Fianna Fail)
Link to this: Individually | In context

I propose to take Questions Nos. 367 and 368 together.

It has not been possible to collate the information requested by the Deputy in the time available. I will write to the Deputy directly once the information is to hand.