Written answers

Tuesday, 23 November 2021

Department of Education and Skills

School Accommodation

Photo of Aindrias MoynihanAindrias Moynihan (Cork North West, Fianna Fail)
Link to this: Individually | In context | Oireachtas source

333. To ask the Minister for Education and Skills the number of new schools established in each county in each of the past ten years in tabular form; the number that opened in temporary accommodation on a temporary site; the number in which permanent sites have since been identified and secured; the number that are now located on a permanent site in temporary and permanent accommodation; and if she will make a statement on the matter. [56922/21]

Photo of Norma FoleyNorma Foley (Kerry, Fianna Fail)
Link to this: Individually | In context | Oireachtas source

The information requested by the Deputy is not readily available in the format requested. However, the information available is being collated by my Department and will be made available to the Deputy shortly.

Photo of Johnny GuirkeJohnny Guirke (Meath West, Sinn Fein)
Link to this: Individually | In context | Oireachtas source

334. To ask the Minister for Education and Skills the measures in place to accommodate pupils of a school (details supplied) in the short term; and if she will make a statement on the matter. [56936/21]

Photo of Norma FoleyNorma Foley (Kerry, Fianna Fail)
Link to this: Individually | In context | Oireachtas source

My Department is aware of increasing pressures and demand for school places in a number of school planning areas including Trim.

However, it is important to note that where enrolment pressures arise, it may not be as a result of lack of accommodation but may be driven by the following factors:

- Duplication of applications – pupils have applied for a place to a number of schools in the area

- School of choice – pupils can’t get a place in their preferred school while there are places in other schools in the town/area

- Some towns/areas have single sex schools and while places are available in the school they are not available to all pupils

- External draw – pupils coming from outside the local area

My Department is working to establish the true extent of any capacity issues through ongoing discussions with the relevant school authorities. In that context, similar to the process adopted in advance of the current academic year, my Department is engaging with patron bodies, including those of schools in Trim, to identify particular capacity requirements for the forthcoming year(s) which may necessitate further action to that already in train

As the Deputy may be aware, my Department has the following major building works planned to assist in the process of providing additional second level places:

- Boyne Community School - 91508C - Major Project to provide an LTPE of 1200 students and 4 SEN base - Architectural design stage. The school has also received grant aid for the provision of interim accommodation to accommodate the increase in enrolments between now and the completion of the build. This project was completed in June 2021.

- Scoil Mhuire - 64450R - Major Project to provide an LTPE of 1000 students and 2 SEN classes - project brief stage

Comments

No comments

Log in or join to post a public comment.